On this page we've included a few of our recent projects. Where possible, we've tried to show the project before we started and then once we'd finished. These are just a few examples and if you have any particular type of example you'd like to see, let us know - we may well have some photos. recent projects.
This completely refurbished bathroom had all items re-located to new positions. The bath and toilet positions were swapped over and a new shower enclosure and basin furniture fitted. All the walls were tiled to the ceiling with an LED illuminated mosaic tiled recess made above the bath. The boxing at the ends of the bath were also fitted with mosaic tiles and a vertical strip of mosaic tiles were fitted inside the shower enclosure. Solid oak door furniture intended for bathrooms were used for storage under the basin and at one end a tall cabinet was also fitted. A marble countertop was specially made to suit the semi-recessed basin. A combination of recessed LED lighting, LED mirror and halogen lighting were fitted as part of an effective lighting design.
Oak doors with marble countertop
Bath with mosaic tiled recess
Tiled shower with mosaic
LED mirror and towel rail
Semi-recessed basin We removed the bath and boxing to make a wet room corner for a disabled customer. This involved removing some of the floor for re-positioning the waste pipe to the new drain position and fitting a sloping floor level waterproof base. Tanking was applied to the walls and floor prior to tiling. A diverter shower valve was fitted which allowed the use of diverting between a fixed rainshower head or an adjusbale shower rail. A recess was made in the wall for storage which included LED lights. Glass shower panels were fitted after the tiling to allow for maximum space and manoeuverability. The shower area was designed for ease of access with grabrails, hinged seat, grippy floor tiles and flexibility of showering.
Bath prior to removal
Completed wet room cornerFor this project we relaced their old kitchen for a Crosby Picasso Beech kitchen and laminate worktops, with complete with new plumbing, electrics, tiling, flooring and decorating.
Kitchen before
Kitchen afterHere we completely removed their existig bathroom, fitted a quadrant shower enclosure, basin and toilet, new flooring and decoration. Laminate marble effect panels were used on the walls instead of tiling to produce an easy to clean, low maintenance long lasting wall finish.
New bathroom
Hand basinThis project involved fitting a new kitchen with electrics and plumbing, wall and floor tiling.
New kitchen
Cooker and Units
CupboardsThis project was a complete refurbishment of a bathroom.
Bathrooom before
Bathroom after
Hand basin
Heated railThis project was a complete kitchen replacement, including floor and wall tiling.
Before
After
Kitchen hob
Floor tiling